
Sockets & Switches
Commercial Kitchen Switching & Controls
A fused spur switch and isolator installed alongside existing climate controls in a commercial kitchen.
All Projects
About This Project
Project Overview
A fused spur switch and a BG isolator were installed in a commercial kitchen to safely control fixed equipment.
Positioned to sit cleanly alongside the existing air conditioning controls already on the wall.
The fused spur is run down on a short length of surface trunking from a high-level switch position, positioned beside the air conditioning controller and isolator above the stainless steel worktop.
Keep Exploring
More Projects
Consumer UnitDual Consumer Unit Upgrade
A dated single board replaced with a dual consumer unit and full circuit re-termination.
An ageing single distribution board was replaced with a modern dual consumer unit, with every circuit re-terminated, labelled and RCBO-protected.
View Project
Consumer UnitNew Consumer Unit Installation
A single-board consumer unit installation with RCBO protection on every way.
A new consumer unit fitted with individual RCBOs, a surge protection device and a 100A main switch, wired and dressed neatly within the enclosure.
View Project
RewiringHallway & First-Fix Wiring
First-fix electrical cabling and socket back-boxes installed during a home rewire.
Cabling and socket back-boxes were installed at first-fix stage before the walls were finished.
View Project
Need a Reliable Electrician?
Get in touch today for a free, no-obligation quote. We're here to help with your electrical project.
- Email to be confirmed
- Phone number to be confirmed
- London & surrounding areas
- Opening hours to be confirmed
